Irrigation Supplies Burbank

When you have completed the preparation stage which include measuring how much artificial grass you will need, installing appropriate drainage (if required) and removing the natural grass layer, you will be able to install your artificial grass lawn. This post outlines the steps you should follow to assist you to do the job right, from laying the base, connecting joints and preventing weed growth.

Lay Gravel Base then Sharp Sand – If neccessary, use treated timber/timber stakes to put in an area frame. We recommend 4 X 2 inches of tantalised treated timber for heavy clay soil areas and poorly draining areas and 2 X 2 inches of tantalised timber for good draining areas. Screw these timbers to the stakes leaving the stakes on the inside of the perimeter. If the Artificial Grass meet a concrete path, wall or decking, position the timber flush with the surface height and also by using 10mm temporary fillet, pack the timber near to the wall leaving the space to enable you to tuck the Artificial Grass involving the timber and also the adjoining material with a later stage.

Position the stakes up against the inner perimeter timber edging and hammer in to the ground ensuring the stakes are slightly below the timber edging. Next screw the timber stake to the timber edging. With heavy clay soils we recommend laying a crushed stone surface as much as 3 inches. This will never be necessary for the majority of areas and just required if you have a high water table in which the ground holds water for a long period of energy after it rains. Next compact the ground employing a vibrating plate that may be hired from an equipment hire company. Ensure the perimeter is compacted and below the timber edging by 1 inch. Infill the perimeter with sharp sand and level using a rake. Guarantee the sand is level to the peak of the timber edging and compact again.

Once and for all drainage areas spread a layer of sharp sand to blind on the soil. Next compact the earth utilizing a vibrating plate that may be hired from an equipment hire company. Ensure the perimeter is compacted and level with all the timber edging. In the event you put more work in at this stage, your Artificial Grass Lawn can look better as a result.

Weed Control Layer – Apply the weed control geo textile membrane and cut as necessary. Tack using small 1 inch galvanised clout nails to the timber edging. This weed control geo textile membrane prevents any possibility of weed growth with the artificial grass drainage holes.

Roll out Artificial Grass – Lay the Artificial Grass inside the desired direction working on the carpet and never on the levelled base. Guarantee the carpet is positioned to minimise cuts, joints and waste overlaying the timber edging by a minimum of 4 inches. If the artificial grass meets a path or edge, and in case you have laid the timber edging correctly as previously described, then the artificial grass can be wedged between. If joining, please be sure that the artificial grass is laid with all the pile running within the same direction on every piece. Lay the carpet along with the sand rather than dragging it across the base material. To help stop wrinkles or creasing you should allow 2 to three hours to settle before continuing with jointing and adhesive. Cut grass to shape employing a sharp Dolphin or Stanley knife or scissors.

Jointing – When jointing your outdoor carpet together, make sure the pile runs within the same direction. Cut off manufacturer’s edge strip (if present) and butt two edges together ensuring you can find no gaps greater than 1mm between the two carpet edges. The precision with this will determine how visible the join is after the completion. Fold back edges and position jointing tape (smooth side down) so that the edges in the carpet fulfill the tape when joined.

Adhesive – a) Apply the cartridge adhesive in a zig zag motion onto the rougher side from the tape allowing one cartridge for every 3 linear metres. Turn down carpet and press both edges into the wet adhesive, ensuring each piece marries up and it has no overlap. When you are carrying this out along with your fingers, mix the fibres together to conceal the join. After the whole length is at place and also you are satisfied featuring its appearance it really is required to walk over the join many times to activate the glue and bond the grass to the tape. Weigh on the seam to ensure good connection with the glue until it cures. The more care taken with all the operation the neater and tidier the joint will be.

b) If utilizing the 2-component multi-purpose adhesive, ensure thorough mixing of the two components before use. Apply adhesive towards the rough side from the tape and spread evenly across a width of at least 20cm using when possible a notched trowel. Sufficient adhesive needs to be applied so that once the artificial grass carpet is pressed into the adhesive, a transfer on the carpet backing is complete. Reject carpet and press both edges into the wet adhesive, ensuring each piece marries up and it has no overlap. Make sure the carpet fails to crest in the seam and it is holding flat over the bonded area. Once the whole length is within place and you also are pleased using its appearance it is actually necessary to walk across the join repeatedly to activate the glue and bond the grass to the tape. Weight the seam to make certain good exposure to the glue until it cures. The greater care taken with the operation the neater and tidier the joint will be.

When you should endeavour not to put adhesive onto the carpet small quantities of glue can be removed from your artificial grass fibre using White Spirit along with a small off cut of the artificial grass. Small quantities of cured glue normally can be removed. To avert this situation and the chance of harm to the artificial grass, care and precautions ought to be delivered to avoid vhhfqr using the fibres all the time. When the artificial grass has been jointed and glued and you are pleased with the levels screw the grass to the timber perimeter framework using galvanised screws at a minimum of 12 inch intervals.

Spread Sand (Optional, according to Grass Selected) – Once the artificial grass has become laid use silica sand, which can be kiln dried and brush into carpet as you go. Each product could have sand infill but this can be only used to stabilise the carpet and at almost no time in case the sand be visible. You need to get an even spread over the surface utilizing a brush to develop the depth in layers. Tend not to apply the sand in one application. Brush sand into pile immediately after laying as the artificial grass is dry even though weather is good. Brush vigorously against the fibres of the carpet pile to encourage the tufts to stand upright. Putting the right level of sand in helps retain the artificial grass to sleep down, protects the fibres and in addition keeps them standing to give it the appearance of real grass.

Artificial Turf Installation Burbank – Learn More..

We are using cookies on our website

Please confirm, if you accept our tracking cookies. You can also decline the tracking, so you can continue to visit our website without any data sent to third party services.